Construction of Robert Kapasa Makasa University, the following infrastructure were completed and operational

– 4 student hostels

– 2 lecture theatres

– 2 blocks of lecture rooms

– 15 staff houses

– landscaping

– construction of walkways, water reticulation system and drainage system

– construction of oxidation ponds

– const. of gate wall

– construction of parking spaces

– construction of the sports fields

– construction of roads within the institution

Construction of Paul Mushindo University, the overall progress for this project is 35% which includes the following infrastructure

 

– 4 student hostels

– 2 lecture theatres

– 2 blocks of lecture rooms

– 15 staff houses

– landscaping

– construction of walkways, water reticulation system and drainage system

– construction of oxidation ponds

– const. of gate wall

– construction of parking spaces

– construction of the sports fields

– construction of roads within the institution

Isoka Trade Skills Center

The construction of Isoka Trade School in Isoka District is complete and operational.

 

 

Construction of nine (9) secondary school under GRZ with overall progress on them all is at 85% which includes the following infrastructure on all the nine schools 162 staff houses, 54 classroom blocks, 9 recreation hall,4 kitchen/ dining hall, 8 boys’ dormitory, 8 girls’ dormitory, 8 laboratories, 4 sick bay, 4 Administration Block, 7 ablution block and 3 tuck shops. The names of these secondary schools are

  • Kampamba Day Secondary School in Mpika district
  • John Mubanga Day Secondary School in Mpika district
  • Chewe Shimfwamba Day Secondary School in Mpika district
  • Kopa Day Secondary School in Mpika district
  • Nakonde Day Secondary School in Nakonde district
  • Michael Sata Boarding Secondary School in Isoka district
  • Chibale Boarding Secondary School in Chama district
  • Matumbo Boarding Secondary School in Shiwangandu district

4.1. CONSTRUCTION OF 13 DAY SECONDARY SCHOOLS UNDER ZEEP

The following 13 secondary schools benefited from 1×3 Classroom block, Administration block, Girls ablution block, Tank stand and 2 Semidetached houses each and the overall progress is 100%.

The following are the schools that were constructed in Muchinga province:

  • Musanya day secondary school in Chinsali district
  • Nzoche day secondary school in Isoka district
  • Ntolondo day secondary school in Nakonde district
  • Kaseya day secondary school in Mafinga district
  • Samu day secondary school in Mafinga district
  • Kalovya day secondary school in Chama district
  • Kalonga day secondary school in Shiwang’andu district
  • Lwanya day secondary school in Shiwang’andu district
  • Changalilo day secondary school in Mpika district
  • Mikuba day secondary school in Kanchibiya district
  • Chalabesa day secondary school in Kanchibiya district
  • Salamo day secondary school in Lavushimanda district
  • Lukulu day secondary school in Lavushimanda district

5.0. HEALTH PROJECTS

  • Construction of Chinsali Modern General Hospital in Chinsali District was completed and Operational. The General Hospital is fully equipped with modern equipment although it has not been commissioned.
  • CONSTRUCTION OF CHAMA HOSPITAL PHAASE III is at 80%
  • Construction of Mafinga District Hospital phase l is 100% complete and awaits equipments to be procured
  • Construction of Muyombe District Hospital Phase I completed and handed over to Ministry of health 2019 but not operational due to insufficient Medical Equipment.
  • Construction of Nakonde District Hospital Phase 1ll by Golden Horse Ltd was completed and the hospital operationalized
  • Construction of 41 prefabricated health post in all the districts was completed and operationalised them.
  • Construction of 4 mini hospitals namely Kabanda, Kopa, Mpumba and Chundaponde were completed and partially equipped.

 

AGRICULTURAL PROJECTS

  • Construction of Livestock Service Centre Tier 2 in Mpika the project was completed and operationalised
  • Construction of one (1no.) Livestock Service Centre (Tier 3) at Mbesuma in Chinsali District project was completed and operationalised
  • Construction of one (01) Veterinary Quarantine Station (VQS) and one (01) Veterinary check Point (VCP) in Nakonde and Mpika Districts was completed and operationalized
  • Construction of one (01) Livestock Service Centre Tier 2 in Isoka District was completed and operationalised
  • Construction of two (2No.) Livestock Slaughter Facilities in Nakonde Districts was completed and operationalised
  • Construction of Livestock Market Centre in Nakonde District was completed and operationalised
  • Construction of Livestock Service Centre (Tier 1+) LOT 2 (Mpika and Mafinga was completed and operationalised
  • Contract for construction of District Veterinary Laboratores in in Chinsali Lot 3, Mpika Lot 4 and Nakonde district Lot 5 were completed and operationalised.
  • Construction of One (1no.) Milk Collection Centre at Malashi in Mpika District of Zambia was done and operationalised.
  • Construction of One (1No) Regional Veterinary Laboratory in Isoka District of Zambia was done and operationalised

 

 

WATER AND SANITATION PROJECTS

  • Rehabilitation of Water Supply and Sanitation Infrastructure in Nakonde district is 90% Completed and the physical status is as follows:

1). Modular Compact Treatment Plant installed and commissioned.

2). Water distribution Networks have been completed.

3). WTP and Old Dam pump houses have been rehabilited

4). Operator houses have been constructed at the WTP, Mwenzo, Katozi, Old Dam and New Dam.

5). New rising main from the Old Dam to the WTP has been installed and commissioned                                        6). 1,513 Mechanical Water Meters and 500 Prepaid Water Meters have been installed

7). Administrative offices have been constructed    was done and operationalised

 

  • Rehabilitation of Water Supply and Sanitation Infrastructure in Chinsali District and progress stand at98% completed Sanitation Infrastructure in Nakonde district is 90% Completed and

1) The Modular Water Treatment Plant has been installed and commissioned.

2) The rising main to Kapasa Makasa University has been installed and commissioned.

3) The 5,000,000m3 Lubu Dam has been constructed and commissioned

4) The Lubu Water Treatment Plant has been Completed and handed over.

5) The Boma Water Treatment Plant is almost complete.

6) 600 mechanical water meters have been installed

 

  • Rehabilitation of Water Supply and Sanitation Infrastructure in Isoka District was completed and operational
  • Rehabilitation and Improvement of Water Supply System-Phase 2 -Mpika, district was completed and the project is in defect Liability Period.
  • Construction and Rehabilitation of Mpika and Nakonde Urban Water Supply and Sanitation System (ISTWSSP) (Lot2) is at 20% and works are ongoing

 

INFRASTRUCTURE PROJECT

  • Construction of 30 Medium Cost Houses for Civil Servants in Chinsali district have been roofed, plastered
  • Construction of 20 Low Cost Houses, 10 Medium Cost Houses and 10 for Civil Servants (One contract for 40 Houses) completed and occupied.
  • Construction of Permanent Secretary and Minister’s House completed and occupied.
  • Construction of Ten (10) Medium Cost Houses for Civil Servants Shiwang’andu district houses have been completed and occupied.
  • Construction of 20 Low Cost Houses for Civil Servants in Shiwang’andu district working on external works
  • Construction of 1 X 4 Bed roomed House for the District Commissioner was completed in Shiwang’andu and Mafinga districts and occupied.
  • Construction of A Six (6) Storey Office Block for Provincial Administration was completed and occupied.
  • Construction of Four (4 floor) Storey Office Block. For Provincial Administration on the last floor and plastering, plumbing, ceiling, electrical, flooring and block work were in progress.
  • Construction of A Four (4) Storey Office Block for Police Head Quarters in Chinsali District is complete and occupied
  • Construction of Civic Centre (3 Storey) in Chinsali district is complete and occupied.

 

ROAD PROJECT

  • Construction of the Chinsali – Nakonde – Road Rehabilitation Project (North South Corridor) Lot1, Chinsali – Isoka Road Section (Km 0 – Km 103) work ongoing and progress is on 38.8%.
  • Construction of the Chinsali – Nakonde – Road Rehabilitation Project (North South Corridor) Lot1, Isoka – Nakonde Road Section (Km 103 – Km 210) work ongoing and progress is on 35.9%.